When I first wrote this post in 2018, after Amazon invested in prefab ADU builder Plant Prefab, the answer to “Can I put a backyard cottage on my lot?” was probably not for most local homeowners. That has changed. Reno adopted a citywide ADU ordinance in October 2025, Washoe County loosened its rules in 2024 and again in 2026, and a 2025 state law (AB 396) now requires Nevada’s largest cities and counties to allow them.

The catch: the rules depend on which government controls your parcel, and a Reno mailing address doesn’t tell you that. Here’s how to figure out which rules apply to you, and what they say.

What Is an ADU?

An accessory dwelling unit (ADU) is a second, independent home on the same lot as a single-family house: a backyard cottage, casita, garage apartment, or in-law suite. It can be detached (a separate building) or attached (an addition or a converted part of the house). It has its own kitchen, bathroom and entrance, but it can’t be sold separately from the main home.

Step 1: Which Rules Apply to Your Property?

Many homes with a “Reno, NV” address are actually in unincorporated Washoe County (parts of the South Valleys, Galena, Spanish Springs, Cold Springs and Washoe Valley, for example). Those parcels follow county rules, not City of Reno rules.

  • Look up your parcel on the Washoe County Assessor’s site. The record shows the jurisdiction and the zoning.
  • Note your lot size and the size of your main home (living area, not the garage). Most limits are based on those two numbers.
  • Check your HOA’s CC&Rs. Reno’s ordinance says ADUs can’t conflict with private restrictions, so an HOA rule can still be a hurdle.

Step 2: The Rules Side by Side

City of Reno City of Sparks Unincorporated Washoe County
Where allowed Anywhere single-family homes are allowed Single-family lots (not on nonconforming lots) General Rural, General Rural Agricultural and residential zones
Minimum lot size 5,000 sq. ft. Per zoning district Attached: 5,000 sq. ft.
Detached: 12,000 sq. ft.
Maximum size Set by zone (Tables 3-6 and 3-7). Example: in SF-3, 1,600 sq. ft. or 50% of the main home, whichever is less 1,000 sq. ft. or 50% of the main home, whichever is less; up to 2 bedrooms 80% of the main home, capped at 1,500 sq. ft. (1,200 sq. ft. in Medium Density Suburban and some denser zones)
Height No taller than the main home No taller than the main home; 2 stories max Zone height limits
Setbacks Same as the main home Detached: in the rear yard, at least 10 ft. from the rear lot line Zone setbacks; small “minor” ADUs 12 ft. tall or less can sit 5 ft. from side and rear lines
Parking 1 on-site space Check with the city 1 added off-street space (some small ADUs on lots over ½ acre are exempt)
How many 1 per lot 1 per lot 1 ADU or guest quarters per parcel
Renting it out Long-term and short-term rentals allowed (per the City’s ADU guide) Shares the main home’s address and utility meters; confirm rental rules with the city Long-term OK; short-term rentals need a county STR permit
Approval Building permit Building permit Detached ADUs on parcels of ½ acre or less need administrative review first; otherwise a building permit in most zones

Sources: City of Reno ADU Guide (rev. 10/13/25); Sparks Municipal Code 20.03.003; Washoe County Development Code Article 306, as amended by Ordinance 1753 (effective Jan. 23, 2026).

A note on Sparks

Sparks’ ADU rules date to 2015. AB 396 required Nevada’s largest cities, including Sparks, to have an ordinance consistent with the new state standards by July 1, 2026, and some of Sparks’ older limits may need to change as a result. Before you design anything in Sparks, confirm the current rules with City of Sparks Planning.

Lake Tahoe (Incline Village and Crystal Bay)

Tahoe Basin properties also fall under the Tahoe Regional Planning Agency, and the state ADU law doesn’t apply there. Washoe County also prohibits new short-term rentals in ADUs in the Tahoe planning area. Expect stricter limits and a longer process; start with Washoe County Planning and TRPA.

What the State Law (AB 396) Changed

Since July 1, 2026, Nevada requires Washoe and Clark Counties and the cities of Reno, Sparks, Las Vegas, Henderson and North Las Vegas to allow ADUs on single-family residential property. Their ordinances can’t:

  • Ban a separate kitchen in the ADU.
  • Require more than one additional parking space, if existing and street parking are adequate.
  • Require side or rear setbacks stricter than the main home’s.
  • Prohibit renting the ADU long-term. (Local governments can still ban short-term/transient rentals.)

The law also says ADUs must meet residential building codes, not commercial codes (so no commercial fire-sprinkler requirements). Read the enrolled bill.

What Does an ADU Cost Besides Construction?

Construction cost depends on size, site work and whether the unit is site-built, modular or a conversion. Get bids before you get attached to a plan. Don’t forget government fees. In the City of Reno, the City’s ADU guide lists approximately:

  • Regional road impact fee: about $3,700
  • Park fee: $800–$1,000
  • Police impact fee: $100–$140
  • Sewer connection fee: $8,744–$13,235, depending on the unit

That’s roughly $13,000–$18,000 before building-permit and plan-review fees, which are based on project valuation. Fees change, so verify at permit time. You may also need new water, power or gas service. Contact TMWA and NV Energy early. In the county, if you’re on a well, a detached ADU needs a water meter, and septic systems need Northern Nevada Public Health approval.

Hiring an ADU Builder in Reno

Many people searching for ADU rules are really shopping for a builder. A few questions to ask any contractor or prefab company:

  • Have you permitted an ADU in my jurisdiction? Reno, Sparks and the county each have their own process.
  • Is your Nevada contractor’s license active? Check it on the Nevada State Contractors Board site.
  • What’s included? Ask for design, permits, foundation, utility connections and site work as separate line items. On prefab units, the “base price” often leaves these out.
  • Who handles the permit? And what is the realistic timeline from first drawing to final inspection?
  • Can I see a finished local project? And talk to that owner.

Does an ADU Add Value?

A legal, permitted ADU can add rental income, room for family, and appeal to buyers looking for multigenerational space. How much value it adds at resale depends on the neighborhood, the quality of the unit, and comparable sales, which are still limited locally because Reno’s ordinance is new. An unpermitted unit can be a liability when you sell. If you’re curious which areas have the most ADU-friendly lots, see Which Reno Neighborhoods Are Best Suited for ADUs?

Next Steps

  1. Confirm your jurisdiction, zoning and lot size on the Assessor’s site.
  2. Talk to a planner: planning@reno.gov (Reno), City of Sparks Planning, or Washoe County Planning & Building.
  3. Get two or three builder bids with fees and utility work included.
  4. Run the numbers: total cost vs. expected rent or family use.

This post is general information, not legal advice. ADU rules change; always confirm current requirements with the city or county before you design, buy or build.


Wondering whether your property, or one you’re thinking of buying, can take an ADU? I’m happy to look up the zoning and talk through options.

Guy Johnson, REALTOR®
Keller Williams Group One, Inc. | S.75262.LLC
📞 (775) 722-4011  |  📧 guyjohnson@kw.com

Share this post...

Facebook
Twitter
LinkedIn

12 Responses

  1. This is great information Guy, thank you. I had this in the back of my mind, having just over an acre with lots of unused space. The second septic/size requirement is a real letdown though! I wonder if some of small rentals I see out in Washoe Valley on other larger properties are in compliance.

  2. I wonder if there are any kind of exceptions for the number of residents in the primary residence?

  3. I don’t think there are really any exceptions here. 1 acre and an accessory dwelling – needs 2 septic systems. Doesn’t matter how many people are living in unit. I think the extra septic system is just a trap to catch people – kind of like a fishnet – And it obviously works.

  4. We added an in-law unit for my mil when we purchased our home. We were able to avoid the 2nd septic by attaching it to our home, hence eliminating the free standing element. I believe the current septic tank size was also a consideration. The unit is private with a separate exterior entrance. Fortunately our home was conducive to adding it with a garage underneath as well.

  5. Thank you Ellen for providing your insight on attaching a 2nd dwelling to the main house. I think that may be the route I take as well.

  6. I recently bought 10 acres in north red rock area can I instal a prefab accessory dwelling to live in? Without having a primary residence. I’m totally off grid

  7. Hello Morgan. Thank you for your question. I would recommend starting with the Washoe County Planning and Building Division to get up-to-date answers.

  8. Hi , I am wondering if I could add a prefab dwelling to my property in Sparks. We do not have C C R ‘s . My daughter is struggling to pay rent and all the bills with her two small children. Our home is 1616 square feet, with regular city sewer. We already have a big concrete pad on the side of our house ?